eShepherds of Light Gallery
Login
eShepherds of Light - Gallery Equipment info M-tree base
Advanced Search
Add Comment RSS Feed for this Album View Slideshow

Equipment info

1. M-tree base 2. M-tree SSR ... 3. M-tree topper
 
P1130680
 

P1130680

Date: 12/19/2008 Views: 2356

M-tree base

Date: 02/03/2009
Size: 14 items
nextlast
 
bend1-P1120413
 

bend1-P1120413

PVC selection - thin-walled PVC bends easier than thick wall (sched 40)

Date: 02/03/2009
Views: 1587
 
bend2-P1120410
 

bend2-P1120410

Prep - nails in wood to form a jig

Date: 02/03/2009
Views: 1625
 
bend3-P1120408
 

bend3-P1120408

Prep - boiling water to help bend the PVC

Date: 02/03/2009
Views: 1619
 
bend4-P1120412
 

bend4-P1120412

Prep - pour water into the PVC, then place on jig to bend to correct angle

Date: 02/03/2009
Views: 1191
 
bend5-P1120433
 

bend5-P1120433

Prep - after cool, remove from jig and trim ends

Date: 02/03/2009
Views: 1479
 
build1-P1120424
 

build1-P1120424

Assembly - cut PVC pieces and collect joiners

Date: 02/03/2009
Views: 1470
nextlast
Page: 1 2 3
Powered by Gallery v2.3